Categorized | Local News

Street Construction

Posted on 19 November 2010 by KWBG

BOONE, Iowa—Boone City officials says several streets have been opened this week, including the intersection at 8th and Benton Streets. However, more work is still planned and the traffic signal at 8th and Benton is still not operational. The intersection at 8th and Benton will be controlled with a 4-way stop sign. Also opened up is Tama Street between 7th and 8th Streets. City Engineer Wayne Schwartz has said even though streets are opening, they are still construction zones and some lane closures and other delays may be experienced while weather permits.

Leave a Reply

You must be logged in to post a comment.

Boone Municipal, IA

Last Updated on Oct 25 2014, 1:55 am CDT

Current Conditions: Fair

NOAA Icon

Temp: 57°F

Wind: NW at 9mph

Humidity: 72%

Windchill: 55°F

Your 5-Day Forecast at a Glance

Advertise Here
Advertise Here